China flue gas desulphurization plant
suppliersCustomized Flue Gas Desulphurization Plant Tower With Spray Absorption And 0.1-0.3MPa Operating Pressure
Price: Negotiate
MOQ: 1 set
Delivery Time: Negotiable
Brand: Delong Environmental Protection
Flue Gas Desulphurization Pumps , Stainless Steel Slurry Circulating Pump
Price: USD 1500-5000 per set
MOQ: 1 set
Delivery Time: 20-35 days after receiving the deposit
Brand: Huatao
Acid Mist Flue Gas Desulphurization FGD Removal Chemical Air Sulfur Wash spray tower scrubber
Price: USD 702/set
MOQ: 1 set
Delivery Time: 25~30 days
Brand: Qiaoda
Flue Gas Desulphurization Tower Ridge Vane Pack Demister Self Cleaning
Price: Negociation
MOQ: 1 set
Delivery Time: 5-9 days
Wall Mounted Flue Gas Desulfurization Plant With High Safety Performance
Price: negotiation
MOQ: 1 set
Delivery Time: 120 working days
Brand: OUCO
VOC Honeycomb Ceramic Substrate Industrial waste gas treatment Fired Power Plant Flue Gas Purification
Price: Negotiable
MOQ: NO
Delivery Time: 5 work days
Brand: Yuxing
FRP Power Plant Flue Gas Desulfurization Tower exausted waste Gas Scrubber Tower purification tower frp high efficiency
Price: $2000-8000 per set,USD 2000-8000 per set,to be negotiated
MOQ: one set ,to be negotiated
Delivery Time: 15 days ,To be negotiated according order
Brand: YONGDA
ODM Flue Gas Treatment System Good Machinability flue gas purification
Price: Negotiable
MOQ: 1 PC
Delivery Time: 7-30days
Brand: SDN
Zr-D13D Flue Gas Moisture Analyzer / Flue Gas Measuring Instrument
Price: USD 11500 ~12000 PER PCS
MOQ: 1
Delivery Time: 5-7 work days
Brand: HiYi
Flue Sensor Portable Flue Gas Analyzer SO2 0 - 5000ppm Gas Detector
Price: Negotiable
MOQ: 1 piece
Delivery Time: 3-5 working days
Brand: YuanTe
Flue Gas Heater Waste Heat Recovery Unit Flue Gas Economizer
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Flue Gas Desulfurization Wastewater Treatment Plant For Textile Industry High-Efficiency Reactor
Price: Negotiatial
MOQ: 1 unit
Delivery Time: Negotiatial
Brand: HDCY
Laser Welded Stainless Steel Finned Tube For Flue Gas Cooler In Heat Recovery Plants
Price: negotiable
MOQ: 1 Pcs
Delivery Time: 1 - 30 Days
Brand: HZFT
Power Plant DeNOx System Exhaust Scr Waste Flue Gas Desulfurization Particular Reduction
Price: $50000/pc-$200000/pc
MOQ: 1 pc
Delivery Time: 10-30days
Brand: Grace
Flue Gas Damper Stainless Steel Valve High Temperature Resistance Waste-to-Energy Plants
Price: Negotiable
MOQ: 1 set
Delivery Time: 15-30 work days
Brand: FABIA
Flue Gas Drying And Blending Sludge Incineration Plant Combustion Treatment With Diesel Oil Assistance
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Flue Gas Boiler Economizer , Heat Economizer In Power Plant Anti Corrosion
Price: Negotiable
MOQ: 1 Set / Sets 10tons
Delivery Time: 30 days
Brand: HD BOILER
Carbon Dioxide Generator, Flue Gases CO2 Plant, Flue Gases Recovery Plant
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Kitchen Flue Gas Water Heater Wall Mounted Instant Tankless 6L Outside Gas Water Heater
Price: $30-$45 Sets
MOQ: 50 Sets
Delivery Time: 30 work days
Brand: OEM
Gas-Solid Separation Mto Regeneration Flue Gas Filter System with Customized Options
Price: Negotiable
MOQ: 50
Delivery Time: Peak Season Lead Time: one month, Off Season Lead Time: one month
Brand: AEET